Timeline / Interior — Press Releases
changed Source changed
A new raw object was archived. Both versions are preserved. 8 line(s) added, 8 line(s) removed.
Evidence
| Source | Interior — Press Releases |
|---|---|
| Agency | Interior |
| URL | https://www.doi.gov/news |
| Observed by | Civic Memory, directly, on 2026-08-31T00:24:28+00:00 |
| Content type | text/html; charset=UTF-8 |
| Current object |
249b3b94fe5de7790024d746e2c822e4d8f6fd839356ab7eaddd206a3bbfe366
download raw
metadata
|
| Previous object |
a15ce795d3cd0b9760b4f053c1fb4988250af53399359a655e9e9ebbd73f8a9c
download raw
metadata
|
What changed derived
This diff is not evidence. It was produced by
civic-memory.diff_engine 1.1.0 at
2026-08-31T00:24:28+00:00 by normalizing the two archived objects above. The
objects are authoritative; this reading of them can be regenerated or deleted
without loss. 8 line(s) added, 8 line(s) removed.
--- previous +++ current @@ -162,6 +162,14 @@ 2026 +U.S. Fish and Wildlife Service Mourns Loss of Federal Wildlife Officer in Oklahoma Fire + +08/30/2026 + +The U.S. Fish and Wildlife Service and Department of the Interior are mourning U.S. Fish and Wildlife Service federal wildlife officer David Taylor, 38 of Scio, Oregon, who is believed to have died on Aug. 29 while helping evacuate residents threatened by the Railroad South Fire in Comanche County, Oklahoma. + +Read more + Interior Finalizes Streamlined Process for Migratory Game Bird Hunting Seasons 08/27/2026 @@ -234,14 +242,6 @@ Read more -Reclamation Publishes Final Environmental Impact Statement for Future Colorado River Operations - -07/31/2026 - -The Bureau of Reclamation has released the Final Environmental Impact Statement, which designates a preferred course of action for future management of Lake Powell and Lake Mead. The preferred alternative establishes an adaptive decision framework to be used to develop operating guidelines designed to ensure reliable operations in the Colorado River Basin while maintaining the flexibility to respond to changing conditions over a 10-year period through 2036. The framework also preserves the opportunity for the Basin to continue working towards consensus agreements, and if successful, be incorporated into future operations. - -Read more - 1 2